3 Initial Configuration
The following sections describe steps involved in configuring the library:
• Library Power, below
• Logging in for the First Time on page 32
• Interpreting the Library Controller on page 33
• Enabling Options on page 36
Library Power
Note: The library must be set up so that the power socket-outlet is
installed near the equipment and is easily accessible.
Powering On
With the library's power cable plugged in and the
breakers switched to the ON position, press and hold
the soft power button (shown at right) for two to three
seconds or until the blue light behind the button
changes state.
The power-on sequence takes about five minutes
(depending on the library configuration), while the
library initializes all components.
Note: An Ethernet connection to the network is optional. If you are
going to connect the library to the network, make sure to do so
prior to powering the library on.
Note: The Spectra T950 library must have a unique IP address. The
default setting for the LCM Ethernet port is DHCP. You may,
however, configure the IP address if needed; see Network Settings
on page 85.
31
Need help?
Do you have a question about the T-Series Spectra T950 and is the answer not in the manual?