i) Fuselage (1. 8. 9. 11. 12. 14. 15. 19.) – check the following:
Fuselage skin - Check
Anti-collision beacon (bottom) - Check
Fibreglass cover (over stabilizator installation points) -
Check
Directional control system - Check
Tail eye - Check
j) Horizontal Tail Unit (9. 10. 11. 12. 13. 14.) – check the
following:
Clearance in horizontal stabilizer instalation points- Check
Stabilizer and elevators - Check skin condition
Clearance in elevator installation points - Check
Horizontal tail unit end tips - Check
Nuts and screws secure - Check
Trim - Check following:
- skin condition
- correctly function
- instalation points
- pull rod condition and corrected attachment
k) Vertical Tail Unit (9. 11. 12. 14.) – check the following:
Clearance in rudder installation points - Check
Vertical tail unit end tip - Check
Nuts and screws secure - Check
Write the inspection results into the Logbook!
59
2 333 371 B
KP 2U POH 05/2022

Advertisement

loading
Need help?

Need help?

Do you have a question about the 200 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Kp-2u