Procedure
Step 1 Install power cables.
Figure 6-15 Parallel system wiring diagram of 15 kVA/20 kVA UPSs (three-phase
input three-phase output, two power sources, without a PDU)
Step 2 Install parallel communications cables.
Figure 6-16 Parallel communications cables
----End
Issue 23 (2024-03-15)
NO TE
For details about how to install cables for the parallel system, see the
20 kVA) Quick Guide .