Page 1
Проконсультироваться и купить данное оборудование вы можете в компании «АНД-Системс» адрес: 125480, г.Москва, ул.Туристская, д.33/1; site: https://andpro.ru тел: +7 (495) 545-4870 email: info@andpro.ru При обращении используйте промокод AND-PDF и получите скидку. UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia)
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes the UPS2000-G-(1 kVA-3 kVA) battery pack in terms of its appearance, features and specifications, and installation and connections. Unless otherwise specified, UPS refers to all the models discussed in this document.
Page 4
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) About This Document Symbol Description NOTICE is used to address practices not related to personal injury. Calls attention to important information, best practices and tips. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration.
Quick Installation Guide (2016, Russia) 1 Precautions Precautions Only the professional technical personnel designated by Huawei are allowed to install and operate the battery pack. Read this document closely before operating the battery pack. Keep this document for future use.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 2 Appearance and Feature Appearance and Feature 2.1 Exterior Rack-mounted battery packs can either be rack-mounted or tower-mounted. As shown in Figure 2-1 Figure 2-2. Figure 2-1 Rack-mounted battery pack Figure 2-2 Tower-mounted battery pack The standard battery pack for 1 kVA UPS is ESS-24V12-9*3AHBPVBB01.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 2 Appearance and Feature Figure 2-3 Standard battery pack (ESS-72V12-9AHBPVBB01) for 3 kVA UPS and its external ports (1) DC port 1 (2) DC port 2 (3) Protection switch Table 2-1 describes the input and output ports on the battery pack.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 2 Appearance and Feature Dimensions (H x W x D): 88 mm x 438 mm x 410 mm Weight: 21.5 kg Graphics of the Interior Figure 2-4 ESS-24V12-9*3AHBPVBB01 battery pack interior 2.2.2 Battery Pack for 2 kVA UPS...
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 2 Appearance and Feature Graphics of the Interior Figure 2-5 ESS-48V12-9*2AHBPVBB01 battery pack interior 2.2.3 Battery Pack for 3 kVA UPS Model ESS-72V12-9AHBPVBB01 Interior One group of battery string is embedded, each group with six 9 Ah/12 V DC batteries. The output voltage of battery pack is 72 V DC.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 3 Installing the Battery Pack Installing the Battery Pack 3.1 Unpacking and Checking After a battery pack is delivered onsite, unpack it and check as follows: If any damage is found on the battery pack appearance, contact the carrier immediately.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 3 Installing the Battery Pack The proposed torque is 3 N•m here. 3.3.2 Tower-mounting a Battery Pack To tower-mount a battery pack, perform the following steps: Procedure: Remove the front panel.
Page 15
Quick Installation Guide (2016, Russia) 3 Installing the Battery Pack Adjust Huawei logo and reinstall the front panel. Assemble the support base and the extended part. The support base is the accessory of UPS, the accessory of battery pack only is the extended part.
Page 16
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 3 Installing the Battery Pack Install the battery pack. The lateral dimensions of UPS and battery pack installed as the above figure is about 300 mm. The installation is complete.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 4 Connecting a Battery Pack and a UPS Connecting a Battery Pack and a UPS 4.1 Connecting a Battery Pack and a 1 kVA UPS Connect the ESS-24V12-9*3AHBPVBB01 battery packs and the 1 kVA UPS using the...
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 4 Connecting a Battery Pack and a UPS ESS-24V12-9*3AHBPVBB01 is allowed a maximum of one group in parallel. The battery pack has two output ports, as a parallel state, the same function. If one used to connect the UPS or battery pack, another can be used to connect an external charger.
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 4 Connecting a Battery Pack and a UPS ESS-48V12-9*2AHBPVBB01 is allowed a maximum of one group in parallel. The battery pack has two output ports, as a parallel state, the same function. If one used to connect the UPS or battery pack, another can be used to connect an external charger.
Page 20
UPS2000-G-(1 kVA-3 kVA) Battery Pack Quick Installation Guide (2016, Russia) 4 Connecting a Battery Pack and a UPS ESS-72V12-9AHBPVBB01 is allowed a maximum of three groups in parallel. The text uses two groups in parallel as an example. If four groups need to be connected, refer to the connection method of two groups.