Staged Reheat - Nailor 35SW Manual

Fan powered terminal unit with epic ecm motor
Table of Contents

Advertisement

Staged Reheat
This application is for BAC 8005-36 controller. The controller are configured to switch reheat units that are controlled with 24 volts
AC. Reheat units with up to three stages of reheat can be controlled by these controllers.
• For one-stage or electric reheat or hot water reheat with an on/off valve, use only output terminal BO6.
• For two-stage reheat use output terminals BO6 and BO7.
• For three-stage reheat use output terminals BO6, BO7 and BO8.
For cooling and heating, a duct temperature sensor is required for automatic changeover.
When connecting the controller to a fan powered VAV terminal unit, the fan circuits must be compatible with the following
specifications.
• The fan start circuit is a 24 volt AC pilot duty output.
• The fan speed output is 0 – 10 volts DC.
Submittal sheets for several variations of this application are available from the Resources page at www.nailor.com.
Figure 7-2 BAC-8005-36 (Single Duct) with three-stage reheat
Duct
Temp
Sensor
Fan
Speed
24VAC
Fan start
Reheat
Stage 1
Stage 2
Stage 3
24 VAC
Date: 10-2016
Supersedes: 7-2016
Nailor reserves the right to change any information concerning product or specification without notice or obligation.
Installation and Operation Manual
COMM
READY
AI1
GND
AO3
AO4
AI5
AI6
GND
AI7
SC
BO5
BO6
BO7
SC
BO8
24VAC
Page 30 of 48
EZvav Digital Controls
ON CTS
1
2
BACnet MS/TP
IOM-EZVAVINST

Advertisement

Table of Contents
loading

This manual is also suitable for:

35s35se

Table of Contents