User's Manual
UTE310 Digital Power Meter
Calibration of Sensor CH
UTE310
Standard power source
Standard Power Meter
Chapter 10 Replace Fuse
This instrument has 1 spare fuse stored in the fuse box. If the fuse was burned out, replace the fuse as the
follow steps .
1) Pull out the power cable, use small screwdriver to take out the fuse box, as shown in the following figure.
If the fuse was burned out, please replace the same specification fuse with the instrument.
The specification fuse with the instrument, see the following table.
Model
Specification of Fuse
UTE310
AC 250V F5A
3)
After the replacement, please put the fuse box back , as shown in the following figure.
Instruments.uni-trend.com
95 / 99