Integration Operation - UNI-T UTE310 User Manual

Digital power meter
Hide thumbs Also See for UTE310:
Table of Contents

Advertisement

User's Manual
current integration q.
2.
Press the "F2" key to switch to the parameter with big font.
When WP is selected by the "F1" key, the integration interface displays WP, WP+ and WP-.
When q is selected by the "F1" key, the integration interface displays q, q+ and q-.
WP: total watt hour
WP+: positive watt hour
WP-: negative watt hour
q: total ampere hour
q+: positive ampere hour
q-: negative ampere hour

5.6.6 Integration Operation

Starting Integration
1.
Press the [Start] key to start the integration, the [Start] indicator will be illuminated, and the "Start"
character will display at the measurement interface.
Stopping Integration
2.
Press the [Stop] key to stop the integration, the [Start] indicator will be extinguished and the
[Stop] indicator will be illuminated. The "Stop" character will display at the measurement interface.
The display interface keeps the integrated value and the integration time before stop.
Resetting Integration
3.
After the integration is stop, if the integration need to run a new round, the integrated value and
the integration time should be reset, press the [Shift + Reset] rest key to reset, the "Reset"
character will display at the measurement interface. The [Stop] indicator will be extinguished and
the integrated value and the integration time will be zeroed, as shown in the following figure.
Instruments.uni-trend.com
UTE310 Digital Power Meter
55 / 99

Advertisement

Table of Contents
loading

Table of Contents