Allied Telesis x330-52GTX Installation Manual page 122

Fanless gigabit layer 3 access switches for virtual chassis stacking
Table of Contents

Advertisement

Chapter 9: Building Stacks with SFP+ Ports S1 and S2
122
2. Power on all the switches of the stack simultaneously. Refer to
"Powering On the Switch" on page 110.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
3. Wait three minutes for the switches to form the stack. They select the
master switch, which assigns itself the ID number 1 and ID numbers 2
to 6 to the member switches.
The stack is now operational. The switches retain their ID numbers
even when reset or powered off.
4. To continue with the installation, go to "Verifying the Stack and
Assigning Priority Numbers" on page 123.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtxX330 series

Table of Contents