Allied Telesis x330-52GTX Installation Manual page 102

Fanless gigabit layer 3 access switches for virtual chassis stacking
Table of Contents

Advertisement

Chapter 7: Installing x330-20GTX, x330-28GTX, and x330-52GTX Switches on a Wall
102
Here are the required tools and material for installing the switch on a wall:
For x330-20GTX and x330-28GTX Switches, one AT-BRKT-J24
wall brackets kit for each switch. The kit is sold separately.
For the x330-52GTX Switch, the two wall//equipment rack brackets
are included with the device.
Four wall anchors and screws (not provided) The diameter of the
screw holes in the brackets is 5mm.
Cross-head screwdriver (not provided).
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided).
Drill and 1/4-inch carbide drill bit for a concrete wall (not provided).
Plywood base if you are installing the switch on a wall with wooden
studs (not provided.) Refer to "Plywood Base for a Wall with
Wooden Studs" on page 103 for illustrations.
Four screws for attaching the plywood base to the wall (not
provided).

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtxX330 series

Table of Contents