Allied Telesis x330-52GTX Installation Manual page 12

Fanless gigabit layer 3 access switches for virtual chassis stacking
Table of Contents

Advertisement

Figures
Figure 50: x330-20GTX and x330-28GTX Switches on a Wall...........................................................................................100
Figure 51: x330-52GTX Switch on a Wall...........................................................................................................................100
Figure 53: x330 Switch on a Wall with a Plywood Base .....................................................................................................103
Figure 54: Steps to Installing x330 Switches on a Plywood Base ......................................................................................104
Figure 56: Attaching the Wall/Equipment Rack Brackets to the x330-52GTX Switch ........................................................106
Figure 58: Marking the Locations of the Bracket Holes ......................................................................................................108
Figure 59: Installing the Power Cord Retaining Clip ...........................................................................................................110
Figure 60: Connecting the AC Power Cord.........................................................................................................................110
Figure 61: Lowering the Power Cord Retaining Clip...........................................................................................................111
Figure 62: Connecting the Power Cord to an AC Power Outlet..........................................................................................111
Figure 63: Management Cable Included with Switch..........................................................................................................112
Figure 64: VT-Kit3 Management Cable ..............................................................................................................................112
Figure 65: Local Management Sessions with the VT-Kit3 Management Cable..................................................................113
Figure 66: Disconnecting the Power Cord from the AC Power Source ..............................................................................115
Figure 67: SHOW STACK Command .................................................................................................................................123
Figure 69: Returning to the Privileged Exec Mode .............................................................................................................125
Figure 70: Saving the Priority Values with the WRITE Command ......................................................................................125
Figure 71: SHOW STACK Command with New Switch Priority Values..............................................................................125
Figure 72: SHOW STACK Command on the Master Switch ..............................................................................................138
Figure 73: SHOW RUNNING-CONFIG INTERFACE Command on the Master Switch .....................................................139
Figure 74: Powering Off the Switch ....................................................................................................................................140
Figure 75: SHOW STACK Command for a Member Switch ...............................................................................................145
Figure 76: SHOW RUNNING-CONFIG INTERFACE Command for Member Switches.....................................................146
Figure 77: Installing an SFP+ Transceiver..........................................................................................................................152
Figure 78: Removing the Dust Cover from an SFP+ Transceiver ......................................................................................153
Figure 79: Positioning the SFP+ Handle in the Upright Position ........................................................................................153
Figure 80: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver .....................................................................154
Figure 81: Installing an AT-SP10TW Cable ........................................................................................................................155
Figure 82: Dimensions of the x330-10GTX Switch .............................................................................................................162
Figure 83: Dimensions of x330-20GTX and x330-28GTX Switches...................................................................................163
Figure 84: Dimensions of the x330-52GTX Switch .............................................................................................................163
Figure 85: Bracket Screw Holes on the x330-20GTX and x330-28GTX Switches .............................................................164
Figure 86: Bracket Screw Holes on the x330-52GTX Switch .............................................................................................165
Figure 87: Pin Layout for the RJ-45 Copper Ports (Front View) .........................................................................................171
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtxX330 series

Table of Contents