Example Of A Project; Project Validation - Reer MOSAIC M1 Installation And Use Manual

Modular safety integrated controller
Hide thumbs Also See for MOSAIC M1:
Table of Contents

Advertisement

MODULAR SAFETY INTEGRATED CONTROLLER MOSAIC

Example of a project

Figure 71 shows an example of a project in which the MOSAIC M1S unit only is connected
to two safety blocks (E-GATE and E-STOP).
The MOSAIC M1S inputs (1,2,3) for connecting the contacts of the safety components are
shown on the left, in yellow. The MOSAIC outputs (from 1 to 2) are activated according to
the conditions defined in E-GATE and E-STOP (see the E-GATE - E-STOP sections).
By clicking on a block to select it, you enable the PROPERTIES WINDOW on the right, which
you can use to configure the block activation and test parameters (see the
E-GATE - E-STOP sections).
At the end of the project design stage (or at intermediate steps) you can save the
current configuration using the icon SAVE

Project validation

Now the finished project must be verified. Execute the VALIDATE command (Icon
standard toolbar).
If the validation is successful, a sequential number is assigned to the input and output of
the project. Then, this number is also listed in the REPORT and in the MONITOR of MSD.
Only if the validation is successful we will proceed to send the configuration.
The validation function only verifies the consistency of programming with respect to the
characteristics of the MOSAIC system. It does not guarantee that the device has been
programmed to meet all the safety requirements for the application.
8540780 • 25/01/2023 • Rev.43
Figure 71
on the standard tool bar.
on the
113