Carrying Out A Test Run; Starting The Welding Process - Fronius FDV 80 Operating Instructions Manual

Straight-line carriage
Table of Contents

Advertisement

Carrying out a
Perform a test run to check that all system components work together correctly. This is
test run
done without an arc and thus allows you to check all movements during the process.
3. Carry out a visual check during the process.
4. If necessary, make the relevant corrections (welding torch position, direction of travel
5. After the test, move the carriage back to its original position.
Starting the
Start the welding process:
welding process
1.
2.
(2)
(1)
NOTE! After you have pressed the "START" button, the carriage only starts to
move once the predetermined start-up delay time has elapsed.
of carriage, traversing speed, etc.).
Set the "Welding ON / OFF" selector switch (1) to the "ON" position.
Press the "START" button (2). The automatic program sequence starts.
1.
Set the "Welding ON / OFF" selector
switch (1) to the "OFF" position.
2.
Press the "START" button (2).
The automatic program sequence
starts.
IMPORTANT! Never leave the
machine unattended, particularly when
it is moving automatically.
13

Advertisement

Table of Contents
loading

Table of Contents