Chapter 3 - Installation Preparation; Safety And Handling Precautions - Spectra Logic T-Series Spectra T200 Supplementary Manual

Site preparation guide
Hide thumbs Also See for T-Series Spectra T200:
Table of Contents

Advertisement

Chapter 3
Installation Preparation
Before the library arrives, make proper arrangements to ensure the safe
handling and movement of the library and components from the delivery
site (for example, a shipping dock or receiving area) to the location where
the library will be installed.
In preparation for your installation, locate the accessory box included with
the library. This box contains product keys and additional information that
you should read before the library is installed. Make sure that you do not
lose any of the product keys.
The following sections outline the requirements for storing and moving the
library and its components. These requirements are intended to protect the
library and its components from damage while they await installation.
Make sure that you review these requirements carefully. As you evaluate
and prepare your site, you can check off these items on the
Site Preparation
checklist on
page
47.
S
H
P
AFETY AND
ANDLING
RECAUTIONS
The library will be installed for you by a certified Spectra Logic field
engineer. Do not attempt to install the library yourself.
This section describes the safety and handling precautions you should take
when receiving the library, storing it prior to installation, and moving it to
the location where it will be installed.
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T-Series Spectra T200 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

T380T680

Table of Contents