Figure 5
properly installed on the library.
Figure 5 Installation of the AC cord locks and the grounding wire.
Network Cabling
Cable Routing
Proper network cabling must be completed and tested before installation
begins. Follow these cable routing guidelines.
Spectra T200 and T380
Spectra T680
Spectra T200, T380, and T680
Contact Spectra Logic Professional Services for more information (see
Contacting Spectra Logic on page
November 2008
shows the location of the cord locks and grounding wire when
Cord lock
assembly
cables can be routed to and from the top and/or bottom of the library
without removing the rear panel.
the rear panel can be removed for routing cables directly into rear panel
components.
access the back of the library and open the rack door
cable routing can be customized on a per-site basis.
Cord lock
assembly
6).
Spectra T200, T380, and T680 Library
Physical Requirements
Ground wire
connection
23
Need help?
Do you have a question about the T-Series Spectra T200 and is the answer not in the manual?
Questions and answers