Chapter 2 — Site Requirements
Cable Connections
In addition to connections to the network where the library will be used,
Spectra Logic recommends providing the following network connectivity
for the library:
Library access—Library access to the internet and an SMTP email gateway
requires a 10BaseT/100BaseT copper Ethernet cable connected to the
Library Control Module (LCM). During standard system configuration,
the library's connection is set up with the library's IP address, subnet,
proxy server, and other IP configuration settings.
BlueScale Vision camera access—The camera is accessed via a separate
Ethernet cable. In order to comply with EMC requirements, use of a
shielded Ethernet cable is required for access to the camera.
E
NVIRONMENTAL
The site where the library is operated must meet the environmental
requirements described in
ensure successful operation of the library.
Air Flow
Air flow through the library is from front to back. Make sure that cold and
hot (airflow in and airflow out) aisle hardware is positioned appropriately
for the library installation location.
Air Quality
The library contains an air filter that keeps the inside of the library free
from particulates that might contaminate its components. Regular
inspection and replacement of the air filter is necessary to keep the library
functioning at optimal levels.
Spectra Logic recommends that the filter be inspected at least once every
three months and replaced as frequently as necessary. Spare filters are
available from Spectra Logic (see
24
Site Prep Guide
Direct Internet
A direct internet connection is recommended so that you
Connection
can use the library's firmware upload features.
E-mail
Access to an email gateway is required to use the library's
automated monitoring and technical support features.
R
EQUIREMENTS
Environmental Specifications on page 42
Contacting Spectra Logic on page
to
6).
91010004
Need help?
Do you have a question about the T-Series Spectra T200 and is the answer not in the manual?