Operating System - WAGO LONWORKS 750-319 Manual

Modular i/o system
Table of Contents

Advertisement

3.1.4 Operating system

Following is the configuration of the master activation and the electrical in-
stallation of the fieldbus station.
After switching on the supply voltage, the coupler performs a self test of all
functions of its devices, the I/O module and the fieldbus interface. Following
this the I/O modules and the present configuration is determined, whereby an
external not visible list is generated.
In the event of a fault the coupler changes to the "Stop" condition. The "I/O"
LED flashes red. After clearing the fault and cycling power, the coupler
changes to the "Fieldbus start" status and the "I/O" LED lights up green.
Determination of the I/O modules
Fig. 3-5: Operating system 750-319
Modular I/O System
®
L
W
ON
ORKS
Switching on the
supply voltage
Initialization,
and the configuration,
"I/O" LED is blinking red
Test o.k.?
Yes
Fieldbus coupler is
in operating mode
"I/O" LED is shining green
Fieldbus coupler/controller
Fieldbus coupler 750-319
No
Stop
red "I/O" LED indicates
blink code
• 51
g012920e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lonworks 750-819

Table of Contents