Gx4 Manipulator Periodic Inspection; Inspection; Inspection Schedule - Epson GX Series Manual

Industrial robot:
Table of Contents

Advertisement

Industrial Robot: SCARA Robots GX series Manual

5.1 GX4 Manipulator Periodic Inspection

5.1.1 Inspection

5.1.1.1 Inspection Schedule

Inspection items are divided into five stages (daily, 1-month, 3-month, 6-month, and 12-month), with additional items added at
each stage. However, if the Manipulator is powered and operated for more than 250 hours in a month, add inspection items
every 250, 750, 1,500, and 3,000 hours.
1-month inspection
(250 hours)
2 months (500 hours)
3 months (750 hours)
4 months (1,000
hours)
5 months (1,250
hours)
6 months (1,500
hours)
7 months (1,750
hours)
8 months (2,000
hours)
9 months (2,250
hours)
10 months (2,500
hours)
11 months (2,750
hours)
12 months (3,000
hours)
13 months (3,250
hours)
:
20,000 hours
* Overhaul (parts replacement)
Daily
1-month
Inspection
Inspection
Perform
daily
:
:
Inspection Item
3-month
6-month
Inspection
Inspection
:
:
Rev.7
12-month
Overhaul*
Inspection
:
:
360

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gx4-a251cGx4-a301cGx4-a351cGx4-b251cGx4-b301cGx4-b351c

Table of Contents