Thermo Scientific VH-D20 Operating Manual page 94

Charged aerosol detectors
Hide thumbs Also See for VH-D20:
Table of Contents

Advertisement

6
Operation
Before Starting Sample Analysis
System Equilibration
Page 94
Before starting an analysis:
Check the liquid level in the solvent reservoirs. Verify that the
amount of solvent is sufficient for the analysis.
Close the doors of all modules in the Vanquish system, if not already
done.
Make sure that the pump flow rate that is delivered to the charged
aerosol detector is within the specified range. See
Specifications
(} page 170).
To deliver pump flow to the charged aerosol detector, follow these
steps:
a) Turn on the detector gas flow. See
Gas Flow
(} page 102). The pump flow must be turned off. Wait
at least 5 minutes before you continue.
b) Turn on the pump flow to the detector. Have the pump deliver
flow to the detector.
Make sure that the chromatography system is properly equilibrated
(see further down).
System equilibration should include the following operations:
Purging the pump (all channels, including those not used for the
application)
Flushing the entire chromatography system with the starting solvent
to rinse out any solvent from a previous analysis run
Warming up (or cooling down) all temperature-controlled devices in
the system to the starting temperature. Temperature-controlled
devices can be, for example
Column compartment and post-column cooler
¨
Sample compartment thermostatting in the autosampler
¨
Flow cell in a fluorescence detector
¨
Evaporation tube in a charged aerosol detector
¨
Turning on the lamp (or lamps) in the UV/VIS detector
Monitoring the pump pressure and pressure ripple and checking
that the pressure is stable and the ripple within reasonable limits for
the application
Turning On/Off the Detector
Charged Aerosol Detectors (VH-D20, VF-D20)
Performance
Operating Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vf-d20

Table of Contents