Thermo Scientific VH-D20 Operating Manual page 48

Charged aerosol detectors
Hide thumbs Also See for VH-D20:
Table of Contents

Advertisement

5
Installation
Moving the Device after Installation
Page 48
7. Recommended:
Perform Instrument Installation Qualification.
In the Chromeleon software, a wizard is available to guide you
through the qualification process. On the Chromeleon 7 Console:
Click Tools > Instrument Qualification > Installation Qualification.
Follow the instructions in the Instruments Installation Qualification
Operating Instructions. The manual provides information about the
required materials and detailed instructions.
NOTICE
If the device is operated with another data system, refer to the
documentation for the software that you are using and/or perform the
qualification manually. The Instruments Installation Qualification
Operating Instructions provide information about the parameters to be
adapted and the required settings.
8. Recommended: Perform Operational Qualification.
The qualification kit includes all materials required for the
qualification and detailed instructions.
If you have to move the device after it has been set up and installed in
the Vanquish system, prepare the device for transport and move it to
the new location. Follow the instructions in
Device
(} page 145).
Transporting or Shipping the
Charged Aerosol Detectors (VH-D20, VF-D20)
Operating Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vf-d20

Table of Contents