Assa Abloy Corbin Russwin PED5000 D Series Installation Instructions Manual page 9

Premium delayed egress
Hide thumbs Also See for Corbin Russwin PED5000 D Series:
Table of Contents

Advertisement

Premium Delayed Egress
PED4000 D, PED5000 D Series Exit Device
Installation Instructions
4
Device Mounting, continued
Note: For additional instructions on hardware install, refer to
mechanical instructions.
3
When required, mount outside trim to door
(see trim installation instructions).
4. Unthread screw and remove dogging slope bracket (Figure 3).
5. Pull the mount rail cover back to expose front end of the carrier/push
assembly (Figure 4).
6. Install chassis on door. Leave chassis screws loose . Insert rail onto chassis. Pin bracket to slot in chassis lift arm
(Figure 5).
7. Slide the mount rail back to the front and replace the dogging slope bracket and screw (Figure 6).
7. Do not install end cap until device has been wired and tested for operation (See wiring diagrams).
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2023 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in part without
the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
Figure 3
Figure 4
Figure 5
Figure 6
9
FM574 01/23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Corbin russwin ped4000 d series

Table of Contents