Premium Delayed Egress
PED4000 D, PED5000 D Series Exit Device
Installation Instructions
5
Wire Routing - continued
PED5600
OVERVIEW
M93 Lever Monitoring
(if applicable)
Step 1 . Install mortise lock . Route
wire as shown .
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2023 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in part without
the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
Electric Trim
(If applicable)
Step 2 . Install chassis and connect M91
jumper at chassis .
19
M91 Connection
Step 3 . Install rail to chassis .
FM574 01/23