Connections Possible Up To 4 Circuits With Buffer Tank - DeDietrich MIT-M /E Installation, User And Service Manual

Reversible packaged air source heat pump
Table of Contents

Advertisement

5 Installation
Hydraulic outlet
Back-up boiler
Outdoor unit
Fig.18
G1"
B
3
3
A1
B1
C1
1 Thermostatic mixing valve
2 Safety unit
28
MIT-M
Circuit
5.6.4
G1"
G1"
B
A
Ø 20mm
4
3
1
2
DHW
Connections to be made
Caution
To ensure optimal operation of the back-up, the flow rate
of the boiler must always be higher than that of the in­
stallation.
3
Install the
/
" non-return valve and the
4
(not provided).
Install a filter on the boiler outlet.
Do not exceed the maximum authorised pipe lengths.

Connections possible up to 4 circuits with buffer tank

G1"
G1"
A
1
2
DHW1
3 Mixing valve
4 Buffer tank
3
/
" nipple on the boiler return
4
G1"
G1"
Ø 16mm
Ø 20mm
7756241 - v02 - 19062020
G1"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mit-m /hMono awhp 6 mrMono awhp 8 mrMono awhp 11 mr

Table of Contents