GE Voluson P6 Service Manual page 248

Hide thumbs Also See for Voluson P6:
Table of Contents

Advertisement

GE H
DRAFT
EALTHCARE
DIRECTION 5459672-100, R
5-10-1-3
Power Up Sequence Description
The Power Up Sequence can be divided in the following steps:
Switch Circuit Breaker in CPS to ON position
Press the ON button on the Operator Panel
RFS power-up
5-10-1-3-1
Power Up Sequence Description
1.) RFS, powered by 5Vstb, detects contact of Power-On button event.
2.) RFS sends PSON_N low to CPS
3.) CPS powers up +24V, +12V,
4.) CPS provides LV_OK as soon as +12V is within specification
5.) CPS provides PC voltages from +12V, +5V.
6.) RFS distribute enable signals for +3.3V, +2.5V, +1.2V, +1.1 to itself and BF64.
7.) RFS provides PS_DONE output signal to CPS.
8.) All Supply voltages are switched on
6
DRAFT (J
EVISION
Figure 5-21 Power Up Sequence
±
5V
Chapter 5 - Components and Functions (Theory)
17, 2013)
ANUARY
V
® P8 / V
OLUSON
OLUSON
P
S
M
ROPRIETARY
ERVICE
® P6
ANUAL
5-41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson p8

Table of Contents