Oracle X5-2 Installation Manual page 62

Hide thumbs Also See for X5-2:
Table of Contents

Advertisement

Install the Cable Management Arm
b.
Gently tug on the left side of the front slide bar to verify that connector A is
properly seated.
Number
1
2
8.
To install the CMA's connector B into the right slide-rail:
a.
Insert the CMA's connector B into the front slot on the right slide-rail until it
locks into place with an audible click [frames 1 and 2].
The connector B tab (callout 1) goes into the slide-rail front slot (callout 2).
62
Oracle Server X5-2 Installation Guide • January 2021
Description
Connector A tab
Left slide-rail front slot

Advertisement

Table of Contents
loading

Table of Contents