Logistics Checklist Considerations
Is the unpacking/staging area protected from the elements?
Does the building have adequate receiving space?
Is the unpacking area air-conditioned to avoid thermal
shock for various hardware components?
Will sufficient moving personnel be available to install the
hardware?
Are you prepared for uncrating and trash removal?
Are there any restrictions on delivery and trash removal?
Are there any restrictions on delivery truck length, width or
height?
Does the customer allow cardboard boxes and other
packing material in the computer room?
Is there a time constraint on dock access? If yes, then
provide time constraints.
Is tail lift required on delivery carrier to unload the
equipment at the delivery dock?
Will any of the following be required to place equipment in
computer room?
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
Does the delivery carrier require any special equipment,
such as non-floor damaging rollers, transport dollies, pallet
jacks, or fork lifts?
Related Information
"Server Physical Specifications" on page 15
■
"Receiving and Unpacking Guidelines" on page 17
■
Oracle Server X5-2 Safety and Compliance Guide
■
Yes
No
N/A
Comment
Site Planning Checklists
Preparation Checklists