Configuring The Project Information Parameters; Technician Id; Job Id; Comment - Viavi E4123MM User Manual

Optical time domain reflectometer for t-berd®/mts-2000, -4000 v2, -5800, smartotdr, celladvisor 5g and oneadvisor-800 platforms
Table of Contents

Advertisement

Configuring the Project Information parameters

In the Setup menu, press Project information.
Figure 30
Project Information parameters
NOTE
Refer to the User Manual of the Cable-SLM option for Project configuration
and use.

Technician Id

Click on the text box to enter the name of the operator carrying out the measurement.

Job Id

Click on the text box to enter a description of the measurement to be performed.

Comment

Click on Comment text box to enter a specific comment to the project.

Configuring the Report parameters

The Report storage parameters must be also configured, in order to define how and
where the results will be saved in the file system of the equipment.
1
In the Setup menu, press File.
User Manual
Chapter 3 Expert OTDR function
Configuring the unit for Expert OTDR
700MAN201 Rev. 004
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents