4.3

Initial start-up

– Open the inspection fl ap on the loading hopper and check that the press chamber is clear.
Remove any spare parts or supplies delivered with the machine.
– Insert the CEE plug into the socket on-site.
– Activate the emergency stop control by pushing the switch bar away from the machine.
– Unlock the emergency stop on the press. (optional)
– Turn on the main switch on the press and shredder.
After a control unit self-test, the
Display shows:
If the fault message 1000 (= phase missing) or 1010 appear in the display
(=reversed rotation) > consult an electrician. (See also the "Malfunctions" section)
Connect the control cabinet before the initial start-up begins.
Select the required language
36
Manual operation - starting position
Warning!
Faults in electrical components and supply cables may only be attended to
by qualifi ed electricians or HSM service engineers.