Installation; General Instructions; Installation Conditions; Supply Connections - HSM SP 5080 Operating Manual

Shredder and baling press combination
Hide thumbs Also See for SP 5080:
Table of Contents

Advertisement

3

Installation

3.1

General instructions

We strongly recommend that installation work on the baling press should be carried out by
trained HSM engineers.
We accept no liability for damage resulting from incorrect installation.
If you do perform installation tasks yourself, make sure you have read and fully understood
the entire operating manual before you start.
3.2

Installation conditions

When deciding where to install the machine (e.g. planning by the customer), make sure
there is enough space around the machine so that assembly and repair work can be
carried out without any obstruction. Upstream and downstream equipment should be
arranged accordingly.
The machine should be installed on prepared foundations so that the shredder and baling
press combination is level.
The shredder and baling press combination may only be operated in dry rooms.
At temperatures of below 0 °C and above 30 °C, use a different hydraulic oil with
suitable viscosity for the baling press or retrofi t tank heating/oil cooler.
3.3

Supply connections

Power is supplied via the central control cabinet of the baling press. A connection cable
with a CEE connector is in the control cabinet.
The installation site must have a CEE 5x32A/6H socket with a suitable fuse rating.
(see "Technical Data")
3.4

Settings

Normally the machine is supplied with all the assemblies mounted and hydraulic lines
connected.
The electrical and hydraulic settings for the various components have been performed
by HSM.
09/2015
Caution!
Unauthorised adjustments to the set values are prohibited and could
seriously damage the machine.
2.993.999.520_en
SP 5080
19

Advertisement

Table of Contents
loading

Table of Contents