2-13-2. Screwing the underside cover ground wire to the underside cover (Only for the EU type models)
Re-tighten the underside cover ground wire that you have removed in
of the control box (Only for the EU type models)"
2-14. Handling the cords
DANGER :
1. To prevent personal injuries caused by electric shock hazards or abrupt start of the sewing machine,
carry out the work after turning OFF the power switch and a lapse of 5 minutes or more.
2. To prevent accidents caused by unaccustomed work or electric shock, request the electric expert or
engineer of our dealers when adjusting the electrical components.
❷
A
❶
❸
❹
❺ ❼
❽
❾
❾
p.7.
1) Bring the cords under the table into the control
box.
2) Put the cord brought into the control box through
cord exit plate ❶ and fix cable clip band ❷ .
Arrange the cord so that it is not tensed
or hitched even when the machine head
is tilted. (See A section.)
3) Install control box cover ❸ with four setscrews
❹ .
For the purpose of preventing the cord
breakage, take care not to allow the
cords to be caught between the control
box and control box cover ❸ when at-
taching the latter.
4) Remove cord clamp setscrew ❺ of the under-
❻
side cover. Pass fan cord ❻ on the machine
head side through cord clamp ❼ . Then, secure
the cord clamp with setscrew ❺ again.
5) Connect fan cord ❻ on the machine head side to
fan cord ❽ on the underside cover side.
6) Detach vinyl wrap film ❾ from the knee lifter
actuation arm.
– 11 –
"2-9-1. Preparing for installation