2.13 Example Procedure: Switch Test - GE DPI620G-IS User Manual

Intrinsically safe calibrator and communicator series
Table of Contents

Advertisement

User Manual

2.13 Example Procedure: Switch Test

CH1, P1, P2 and IDOS functions use the CH2 switch
connections. CH2 functions use the CH1 switch
connections.
Switch operation
When setting the Switch Test utility on one channel, the
software automatically sets-up the other channel for
the switch connections.
Note: If there is a measure or source function on the
switch connection channel it is automatically disabled.
The display will show a screen message:
29 July 2016
116M5464 Revision -
Druck DPI620G-IS
Page 70 of 248

Advertisement

Table of Contents
loading

This manual is also suitable for:

Druck dpi620 genii

Table of Contents