Installation

Installation checklist

This chapter shows how to plan for and successfully install your enclosure system into an industry standard 19-inch rack
cabinet.
CAUTION: To install the system, use only the power cords supplied, or power cables that match the specification
quoted in
"AC power cords" (page
The following table outlines the steps required to install the enclosures, and initially configure and provision the storage
system. To ensure successful installation, perform the tasks in the order presented.
Table 8 Installation checklist
Step Task
1
Unpack the enclosure
2
Install the controller enclosure and optional
drive enclosures in the rack.
3
Connect power cords.
4
Test enclosure connectivity.
5
Install required host software.
6
Connect hosts.
7
Connect remote management hosts.
8
Obtain IP values and set network port IP
properties on the controller enclosure.
9
For CNC models, verify the host interface
protocol setting (not necessary for SAS models).
10
Perform initial configuration tasks:
Sign-in to the web-browser interface to
access the application GUI.
Verify firmware revisions and update if
necessary.
Initially configure and provision the
system using the SMC.
1-The environment in which the enclosure operates must be dust-free to ensure adequate airflow.
2-For more information about hosts, see the About hosts topic in the Storage Management Guide.
3-The Storage Management Console is introduced in
information.

Planning for installation

Before beginning the enclosure installation, familiarize yourself with the system configuration requirements. The figures
listed below show the locations for each plug-in module:
2U12 front panel: see
2U24 front panel: see
99).
1
2
3
"Accessing the SMC" (page
Figure 5 (page 20)
Figure 6 (page 20)
Where to find procedure
See
"Unpacking the enclosure" (page
See
"Required tools" (page
See
"Requirements for rackmount installation" (page
See
"Power cord connection" (page
See
"Testing enclosure connections" (page
See
"Host system requirements" (page
See
"Host system requirements" (page
See
"Connecting a management host on the network"
(page
47).
See
"Obtaining IP values" (page
For USB CLI port and cable see
See
"CNC technology" (page
setting the host interface protocol for qualified SFP options.
See
"Change the CNC port mode" (page
Topics below correspond to bullets at left:
See the "Getting Started" chapter in Storage Management
Guide.
See
"Updating firmware" (page
the Storage Management Guide.
See the topics about configuring the system and provisioning
the system in the Storage Management Guide.
55). See the Storage Management Guide or online help for additional
37).
37).
37).
41).
41).
41).
41).
48).
"USB device
connection".
42), The CNC IOMs allow for
51).
47). Also see the same topic in

Installation checklist

35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Realstor 4005 series

Table of Contents