Figure 160. Water loop carrier removal
Step 7.
Install water loop screws (9x Torx T10 screws per node) with a torque screwdriver set to the proper
torque.
Note: For reference, the torque required for the screws to be fully tightened/removed is 0.5-0.6
newton-meters, 4.5-5.5 inch-pounds.
ThinkSystem SD650 V3 Neptune DWC Tray User Guide
158