Battery Installation - Pylontech Pelio-L-5.12 Operation Manual

Lithium-ion phosphate battery
Hide thumbs Also See for Pelio-L-5.12:
Table of Contents

Advertisement

Reminding
Choose suitable ground
Choose the ground capable of supporting the full weight of battery system (max. 200kg,
which is four battery modules per stack) and able to fix in the expansion bolt properly.
2) Fix the base on the ground.
Position of expansion bolt.
Away from wall: 110mm
Space between: 504.5mm
Torque: 35 N.m
Tool: socket spanner
Fastener: 2 pcs, M8*60
expansion bolt
4.4.3

Battery installation

1) Place the battery module on the base and fix the foot with 4 screws.
Torque: 3 N.m
Tool: hexagon socket,
Fastener: 4 pcs, M5*20
2) For multiple battery installation, lift the next battery module and put it on the top
of previous battery module. And fix the foot with 4 screws.
3) Before install the last battery. Using the foam of battery module packaging to get
the position of expansion bolt for wall mounting bracket.

Advertisement

Table of Contents
loading

Table of Contents