    This manual introduces PHANTOM S from Pylontech. Please read this manual before you install the battery and follow the instruction carefully during the installation process. Any confusion, please contact Pylontech immediately for advice and clarification. Contents SAFETY PRECAUTIONS ........................2 1.1 Before Connecting ........................
  • Page 3: Safety Precautions

    1. Safety Precautions Reminding 1) It is very important and necessary to read the user manual carefully (in the accessories) before installing or using battery. Failure to do so or to follow any of the instructions or warnings in this document can result in electrical shock, serious injury, or death, or can damage battery, potentially rendering it inoperable.
  • Page 4 5) In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are prohibited; 6) Please do not open, repair or disassemble the battery except staffs from Pylontech or authorized by Pylontech. We do not undertake any consequences or related responsibility which because of violation of safety operation or violating of design, production and equipment safety standards.
  • Page 5: Introduction

    US2000 Plus lithium iron phosphate battery is one of new energy storage products developed and produced by Pylontech, it can be used to support reliable power for various types of equipments and systems. US2000 Plus is especially suitable for application scene of high power, limited installation space, restricted load-bearing and long cycle life.
  • Page 6: Specifications

    2.2 Specifications Basic Parameters Phantom-S Nominal Voltage V Nominal Capacity Ah Dimension mm 445*410*98 Weight Kg Discharge Voltage V 45 ~ 54 Charge Voltage V 52.5 ~ 54 Peak Discharge Power kW 5kW@1Min Peak Charge Power kW 5kW@1Min RS232 RS485 CAN...
  • Page 7: Equipment Interface Instruction

    2.3 Equipment Interface Instruction This section details the front and back panel of the interface functions. PHANTOM Product Front Interface Folded Touch Holder Folded Holder Button Folded Ears Folded Ears: used to be installed in a rack of 19” standard equipment cabinet.
  • Page 8 LED Status Indicators LED Indicator LED Light Battery Status OFF Mode All OFF Shut Down Breathing Lamp: bule, Charging. LEDs indicat Capacity LEDs: the capacity. ON / Flash2 Breathing Lamp: bule, Discharging Flash3 LEDs indicat Capacity LEDs: the capacity. Breathing Lamp: bule, Flash1 Standby Mode...
  • Page 9: Phantom Product Back Interface

    PHANTOM Product Back Interface Power Switch Power Switch: BMS standby, no power output RUN LED: to show the Power Switch is ON, and the equipment has electricity. ADD Switch (5) ADD Switch: 4 ADD switches, Dip1 i n i 9600). Nether position is OFF, means “0”. Upper position is ON, means “1”. “0000” setup the baud rate 115200, and “1000”...
  • Page 10: Definition Of Rj45 Port Pin

    CAN Communication Terminal: (RJ45 port) follow CAN protocol, for output batteries information. RS485 R485 Communication Terminal: (RJ45 port) follow RS485 protocol, for output batteries information. Link Port 0, 1 Link Port 0, 1 Communication Terminal: (RJ45 port) follow RS485 protocol, for communication between multiple parallel batteries.
  • Page 11: Bms Function

    Dry Contact Terminal Dry Contact Terminal: provided 1 way input and 3 ways output dry contact signal. BMS function Protection and Alarm Management and Monitor Charge/Discharge End Cells Balance Charge Over Voltage Intelligent Charge Model Charge/Discharge Over Current Charge/Discharge Current Limit High/Low Temperature Capacity Retention Calculate Short Circuit...
  • Page 12: Safe Handling Of Lithium Batteries Guide

    3. Safe handling of lithium batteries Guide 3.1 Schematic Diagram of Solution INVERTER PV ARRAY Public Grid Local Load BATTERY MODULE 3.2 Explanation of Symbols 3.2 Expla ation of Symbols 18PISV0805 10 / 22...
  • Page 13: Tools

    3.3 Tools The following tools are required to install the battery pack Wire cutter Crimping modular Plier Screw driver NOTE Use properly insulated tools to prevent accidental electric shock or short circuits. If insulated tools are not available, cover the entire exposed metal surfaces of the available tools, except their tips, with electrical tape.
  • Page 14: Installation

    4. Installation 4.1 Package Items Unpacking and check the Packing List For battery module package: Two power cables and one communication cable for each battery package: Grounding cable and screws: 2) For battery system connects to inverter: Two long power cables (current capacity 120A) and one communication cable for each energy storage system: NOTE These three long cables are NOT in battery package, they are in another extra small cable box.
  • Page 15: Installation Location

    4.2 Installation Location Make sure that the installation location meets the following conditions: The area is completely water proof. The floor is flat and level. There are no flammable or explosive materials. The ambient temperature is within the range from 0°C to 50°C. The temperature and humidity is maintained at a constant level.
  • Page 16 Back Face Put the battery into the cabinet; Drive the 4 pcs screws; Connect the cables between battery modules Connect the cables to inverter B. Power On Double check all the power cable and communication cable. (1) Switch power on Switch on all the battery modules and the green LED light below will be on: 14 / 22 18PISV0805...
  • Page 17 (2) The one with empty Link Port 0 is the Master Battery Module, others are slaves: (3) Touch the start button of master battery to power on, all the battery LED light will be on one by one from the Master battery: If all the battery LED lights on, and then off, which means the battery system is good and working.
  • Page 18 C. Installation with bracket: 18PISV0805 16 / 22...
  • Page 19 Aim at the 4 pare of Location Pin and Location Hole, stack the batteries together. And hasp the 4 agraffes together. 18PISV0805 17 / 22...
  • Page 20 Maximum 4 batteries can be athwart stacked One or two batteries can be sidelong stacked Cables connection and batteries system start are same as cabinet installation. 18PISV0805 18 / 22...
  • Page 21: Multiple Battery Groups Can/Rs485 Communication Cable Connection

    NOTE After installation, do not forget to register online for full warranty: www.pylontech.com.cn/service/registration NOTE To start the system, if has grid power, it should turn on the inverter at first, to avoid current pulse of the inverter add on the battery bank.
  • Page 22 18PISV0805 20 / 22...
  • Page 23: Trouble Shooting Steps

    5. Trouble Shooting Steps 5.1 Problem determination based on: 1) Whether the battery can be turned on or not; 2) If battery is turned on, check the red light is off, flashing or lighting; 3) If the red light is off, check whether the battery can be charged/discharged or not. 5.2 Preliminary determination steps: 1) Battery cannot turn on, switch on the lights are all no lighting or flashing.
  • Page 24 5) In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are prohibited; 6) Please do not open, repair or disassemble the battery except staffs from Pylontech or authorized by Pylontech. We do not undertake any consequences or related responsibility which because of violation of safety operation or violating of design, production and equipment safety standards.