Installation And Operation; Package Items - Pylontech US2000 Operation Manual

Rechargeable li-ion battery
Hide thumbs Also See for US2000:
Table of Contents

Advertisement

4. Installation and operation

4.1 Package items

Unpacking and check the Packing List
1) For battery module package:
Two power cables and one communication cable for each battery package:
Grounding cable:
2) For battery system connects to inverters:
Two long power cables (current capacity 120A, constant 100A) and one
communication cable for each energy storage system:
NOTE
These three cables are belonging to External Cable Kit, NOT in battery package.
They are in another extra small cable box. If there is anything missed please
contact dealer.
180
180
180
1000
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents