⚫
Plywood sheeting of sufficient thickness
⚫
Solid concrete or masonry
⚫
Metal studs of sufficient gauge
2)
Turn the base upside down. Install the two holders on the base.
Torque: 2 N.m
Tool: Screw driver PH2
Fastener: 4 pcs, M6*16
3)
Fix the holder on the wall. Please ensure the horizontal of the base. A level
may needed.
Position of expansion bolt:
Total 6 holes
Torque: 35 N.m
Tool: socket spanner
Fastener: 6 pcs, M8*60
expansion bolt
4.4.2
Ground Mounting
1) Plan the location in advance and choose a level surface. Make sure the area is
isolated from hazards that could damage battery system, such as heating source,
flammable material or flooding. Consider the spacing requirements for battery
system.