Installation
2) Cable connection: Ground cable connection:
Figure 13: Battery rack
Figure 14: Battery grounding point
Page 23
1) Based on metal directly touch between the module's surface
and rack's surface. If using painted rack, the corresponding
place shall remove the painting.
2) Install a grounding cable to the grounding point of the
modules.
Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663