Figure 94: Installing Sp10Tw Cables - Allied Telesis AlliedWare Plus GS980MX Series Installation Manual

Stackable gigabit layer 3+ ethernet switches
Table of Contents

Advertisement

Figure 94. Installing SP10TW Cables
4. Slide the transceiver into the port until it clicks into place.
5. Connect the other end of the cable into an SFP+ port on another
network device.
6. Repeat this procedure to install additional transceivers.
Note
To remove the connector and cable from the port, gently push on the
connector, pull on the release tab, and slide the connector from the
port.
GS980MX Series Installation Guide for Virtual Chassis Stacking
2 6
2 5
2 7
2 5
2 7
2 6
237

Advertisement

Table of Contents
loading

Table of Contents