Overview Of The Connection Area - Alpha ESS SMILE-S6 Series Installation Manual

Energy storage system
Table of Contents

Advertisement

Your Smart Energy

Overview of the Connection Area

7.1
Position
Designation
1
Battery breaker* of battery pack
2
Power button of battery pack
3
BAT+ connection port
4
BAT- connection port
5
BMS Communication connectors
6
Grid connection port ;
7
Backup connection port ;
8
Connection point for an additional grounding
9
Communication port(CAN/RS485,BMS, LAN, Meter/Grid-CT,
DRM**, PV-CT, AUX)
10
Battery breaker* of SMILE-S5
11
Connection port for the WiFi module
*
All breakers of SMILE-S5 are switched off when shipped.
**The DRM is only for regions with AS/NZW 4777.2 safety regulations.
___________________________________________________________________
Page 34 of 74
Alpha ESS Co., Ltd.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents