zz
Overview of the Connection Area
7.1
Position
Designation
1
Battery breaker of battery pack
2
Power button of battery pack
3
BAT+ connection port
4
BAT- connection port
5
BMS Communication connectors
6
Grid connection port ;
7
Backup connection port ;
8
Connection point for an additional grounding
9
Communication port(CAN/RS485,BMS, LAN, Meter/Grid-CT,
DRM, PV-CT, AUX )
10
Battery breaker of SMILE-B3-PLUS
11
Connection port for the WiFi module
*
All breakers of SMILE-B3-PLUS are switched off when shipped.
___________________________________________________________________
Alpha ESS Co., Ltd.
Your Smart Energy
Page 31 of 69