10. Spindle Functions
Spindle phase alignment
Spindle phase synchronization starts when the spindle phase synchronous control signal (SPPHS)
is input during the spindle synchronization control mode. The spindle phase synchronization
complete signal is output when the spindle synchronization phase reach level setting value (#3051
spplv) is reached.
The synchronous spindle's phase shift amount can also be designated from the PLC.
Device No.
Y433
X42C
R159
Spindle synchronous control
(Y432)
In spindle synchronous
control (X42A)
Spindle synchronization
complete (X42B)
Spindle phase synchronous
control (Y433)
Spindle phase synchronization
complete (X42C)
(Note 2) Turns OFF temporarily to change the rotation speed during phase synchronization.
Signal name
Abbrev.
Spindle phase
SPPHS
synchronous
control
Spindle phase
FSPPH
synchronization
complete
Phase shift
amount setting
Spindle phase
synchronous control ON
Spindle synchronization
complete ON
Spindle synchronization
control ON
92
10.8 Spindle synchronization control II
Explanation
Spindle phase synchronization starts when this
signal is turned ON during the spindle
synchronous control mode.
(Note 1) If this signal is turned ON in a mode
other than the spindle synchronous
control mode, it will be ignored.
This signal is output when the spindle
synchronization phase reach level is reached
after starting spindle phase synchronization.
Designate the synchronous spindle's phase shift
amount.
Unit: 360°/4096
(Note 2)
Spindle phase
synchronization complete ON
Spindle phase
synchronous control OFF
Spindle synchronous
control OFF