Preparing The Power Cord - Agilent Technologies Medalist i1000 Installation Manual

In-circuit test system
Table of Contents

Advertisement

Preparing the Power Cord

WA R N I N G
To assemble the power cord, follow these steps:
1
Figure 8 Power connector
2
Figure 9 Remove black connector insert
8
The Medalist i1000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
Locate the power connector provided
Loosen the two screws holding the cable retainer at the back of the
power connector. Then unscrew the black connector insert to separate
it from the metal casing
(Figure
(Figure
9).
8).
Medalist i1000 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents