Nortel DMS 100 Series Maintenance Manual page 226

Remote switching center multi-access
Hide thumbs Also See for DMS 100 Series:
Table of Contents

Advertisement

6-74 RSC-M card replacement procedures
NTMX79
in an RSC-M
(continued)
4
5
6
7
297-8223-550 Standard 04.02 November 2000
To determine the location of the RCO2 extension half shelf (left or right) that
contains the circuit card to replace, type
>QUERYPM
and press the Enter key.
Example of a MAP response:
PM Type: RCO2 PM No.: 0 PM Int. No.: 9 Node_No: 24
PMs Equipped: 53 Loadname: KRI07BI1 EEPRom Load:MX77NG03
WARM SWACT is supported and available
RCO2 0 is included in the REX schedule.
REX on RCO2 0 has not been performed.
Node Status: {OK, FALSE}
Unit 0 Act,
Status: {OK, FALSE}
Unit 1 Inact, Status: {OK, FALSE}
Site Flr RPos Bay_id Shf Description Slot EqPEC
RSC-M 00
C02
RSC-M 00
RSC-M 00
C02
RSC-M 00
Observe the LED on the defective NTMX79 circuit card. The system removes
the LED when the unit to which the LED connects is inactive.
If the defective card
connects to the active unit
connects to the inactive unit
To switch the processing activity (SWACT) to the inactive unit, type
>SWACT
and press the Enter key.
Example of a MAP response:
RCO2 0
A Warm SwAct will be performed after
data sync of active terminals.
Please confirm ("YES", "Y", "NO", or "N"):
If the system
prompts you to confirm a warm
SWACT
rejects the SWACT
To confirm the command, type
>YES
and press the Enter key.
05
RCO2: 000
47
EXT:LEFT
01:13 MX86AA
Do
step 6
step 8
Do
step 7
step 25
MX85AA

Advertisement

Table of Contents
loading

Table of Contents