9 Putting into Service
WARNING!
Risk of injury when working on the bed!
►
Ensure that the bed is disconnected from the mains connection prior to putting into service, putting out of service
and maintenance.
►
Ensure that the castors are locked prior to putting into service, putting out of service and maintenance.
CAUTION!
Material damage due to incorrect putting into service!
►
Ensure that putting into service is performed exclusively by manufacturer´s customer service or trained hospital
personnel.
Set up the bed as follows:
►
Unpack the bed.
►
Check the delivery (see Scope of Delivery).
►
Remove isolating foil from mains control box (see Removing Isolating Foil).
►
Install equipment and accessories.
►
In case of delivery with dismounted head board and foot board, mount the head board and foot board (see Head Board
and Foot Board).
►
Set-up the bed only on a suitable floor surface (see Transport).
►
Ensure the mains cable does not collide or get stretched when adjusting the bed. Check the plug is inserted correctly.
►
Do not leave any extension cords or power strips loose on the floor.
►
Ensure all the required mechanical and electrical prevention mechanisms are available on site.
►
There is no mains switch on the bed, i.e. the mains cable is the only means to isolate the bed from the mains.
►
Ensure the mains cable is always accessible.
►
The plug on the mains cable should only be changed and maintained by qualified and trained service technicians
authorised by the manufacturer.