GE Vivid 7 Service Manual page 492

Hide thumbs Also See for Vivid 7:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FC091194, R
IRECTION
10-7-5-3
Data Sheet for Chassis Source Leakage Current
The test passes when all readings measure less than the value shown in
on the PM Inspection Certificate.
Tester Polarity
Unit Power
Enter Name of tested peripheral here:
ON
ON
ON
ON
OFF
OFF
OFF
OFF
10-7-6
Isolated Patient Lead (Source) Leakage–Lead to Ground
10-7-6-1
Definition
This test measures the current which would flow to ground from any of the isolated ECG leads. The
meter simulates a patient who is connected to the monitoring equipment and is grounded by touching
some other grounded surface. Measurements should be made with the ground open and closed, with
power line polarity normal and reversed, and with the ultrasound console Off and On. For each
combination the operating controls, such as the lead switch, should be operated to find the worst case
condition.
Equipment damage possibility. Never switch the Polarity when the unit is powered ON. Be sure
CAUTION
to turn the unit power OFF before switching the polarity using the POLARITY switch. Otherwise,
the unit may be damaged.
10 - 16
02
EVISION
Table 10-16 Typical Data Sheet for Chassis Source Leakage Current
Tester Neutral
or Ground
Switch
Switch
NORM
OPEN
NORM
CLOSED
REV
OPEN
REV
CLOSED
NORM
OPEN
NORM
CLOSED
REV
OPEN
REV
CLOSED
Section 10-6 - Using a Phantom
Test 1
Probe
Test 2
Connector
Wheel
V
7 / V
7 PRO S
IVID
IVID
ERVICE
Table
10-12. Record all data
Test 3
Optional
Optional
CRT
Test 4
Test 5
M
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid 7 proFc091194

Table of Contents