GE M
S
EDICAL
YSTEMS
D
FC091194, R
IRECTION
5-11-6
Front End Controller Board, FEC-2
5-11-6-1
General Description
The Front End Controller Board controls the other boards in the Front End. Most of the control is done
through the Frond End Bus.
Main tasks done by the board:
•
System Master Clock generator
•
Transmitter Control
•
ATGC Control
•
Receive Focusing Control
•
Analog Test Signal Generator
•
High Voltage Control and supervision
•
Probe Sensing
•
Control of Relay Board
•
Temperature Sensing for TEE probes
•
Step Motor Control for TEE probes
•
Temperature Sensing for circulated air
5-11-6-2
Location in the Unit
FEC-2 Board
5 - 56
02
EVISION
Front of
Scanner
Figure 5-28 FEC-2 Board: Location in Unit
Section 5-11 - Circuit Boards
V
7 / V
7 PRO S
IVID
IVID
ERVICE
M
ANUAL