Daikin VAM Series Engineering Data page 124

Heat reclaim ventilator
Table of Contents

Advertisement

Operation Manual
Recommended replacement cycle of
consumables
[Note: The replacement cycle is not the same as
the warranty period.]
T able 2. "Replacement Cycle" Lists
Name of Main Part
Air lter ( )
High-performance filter
(optional accessory)
Name of Main Part
Heat exchange element
NOTE 1
This table indicates main parts. See the
maintenance and inspection contract or details.
NOTE 2
This replacement cycle indicates the recommended
duration until the need arises for replacement; this
ensures the product is operational for as long as
possible.
Use it for appropriate maintenance design
(budgeting parts replacement cost,etc.).
If the unit is used for a building for The Building
Sanitation Act (Former Buiding Managment Act),
periodic inspection is required.
For details, contact your dealer or the contact center.
Any failures cause by unauthorized vendors
performing dismantling or internal cleaning of the unit
will not be covered by the warranty.
Moving and disposing the unit
Contact your dealer or the contact center for
moving and reinstalling the total heat exchanger
due to relocation, etc., as this requires technical
expertise.
Disposal of the product should be done in
accordance with the relevant local regulations.
Inquiry
For after-sales service,etc.,contact your dealer
or the contact center.
11
122
Inspection
Replacement
Cycle
cycle
damaged
1 year
1 year
Inspection
Replacement
Cycle
cycle
2 years
6 to 10 years
EDMMT712101
3P645002-1
VAM-HVE/HVLT Series

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents