(Optional) Installing Air Filter Doors; Verifying The Installation - H3C SecPath M9000-AI Manual

Table of Contents

Advertisement

Figure 2-30 Routing cables (M9000-AI-E16 gateway)

(Optional) Installing air filter doors

The M9000-AI gateway supports air filter doors. For more information about installing air filter doors,
see the installation guide for the air filter doors.

Verifying the installation

Table 2-6 Post-installation checklist
Item
Installation site
Gateway
Cables
Requirements
No condensation on the surface of the gateway or inside of the gateway.
Keep the gateway clean and dust-free.
No packing boxes, packing bags or other packing materials left in the installation
site.
Keep the air inlet and outlet vents of the gateway free of obstruction.
All modules are installed correctly.
No slot is empty. Each is installed with a module or filler panel,
Fan trays are installed correctly.
The gateway is grounded reliably with the provided grounding cable. Both ends of
the grounding cable are securely connected.
No switch or fuse is installed on the grounding cable.
The power cords are connected reliably and no short circuit has occurred in
power input and output.
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e8Secpath m9000-ai-e16

Table of Contents