H3C SecPath M9000-AI Manual page 27

Table of Contents

Advertisement

On an M9000-AI-E16 gateway, the power supply slots are located at the top of the rear panel. Make
sure the latch is above the handle when you install the power supply.
The installation procedure is the same for AC and DC power supplies. The following procedure
installs a power supply on an M9000-AI-E16 gateway.
To install an AC power supply:
1.
Put your forefinger into the hole in the filler panel and pull out the filler panel along the guide
rails.
Figure 2-25 Removing a filler panel (M9000-AI-E16 gateway)
2.
Correctly orient the power supply.
3.
Align the power supply with the power supply slot. Then slide the power supply along the guide
rails into the slot until the latch locks the power supply in place.
Figure 2-26 Installing an AC power supply (M9000-AI-E16 gateway)
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e8Secpath m9000-ai-e16

Table of Contents