Routing Signal Cables - H3C SecPath M9000-AI Manual

Table of Contents

Advertisement

Figure 2-28 Installing a transceiver modules and fiber cable (with LC fiber connector)
Figure 2-29 Installing a transceiver modules and fiber cable (with MPO fiber connector)

Routing signal cables

The cable management brackets are attached to the chassis front edges on its two sides. As a best
practice, route the cables from the left half of the chassis through the left cable management
bracket and the cables from the right half of the chassis through the right cable management
bracket, as shown in
Figure
2-30.
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e8Secpath m9000-ai-e16

Table of Contents